Installation & Commissioning & Ramp-Up

We Install, Commission, And Ramp Up Your Machines

Independent and vendor-neutral, our on-site engineers install each machine, connect services, commission tools, and manage the ramp-up to agreed yield, OEE, and throughput.

Installation

We physically install each tool: placement, leveling/anchoring, utilities hook-up (power, water, gases, air, HVAC), interlock checks, and EHS controls — tool by tool and line by line.

Commissioning

We execute SAT-0/1/2/3 and IQ/OQ/PQ, load recipes, run golden lots, verify set-points, and release tools to production.

Ramp-Up

We manage the start-up curve with daily/weekly dashboards, bottleneck removal, MSA/GRR for metrology, and consumables tuning until handover targets are met.

 

 

All in one engineering solutions for your factory

Outputs You Receive By The End Of Installation, Commissioning & Ramp-Up

Delivered in editable formats with clear revision history—so operations can start immediately without rework.

Frequently asked questions

Do you only supervise, or do you install the machines?

We install, commission, and ramp up the machines ourselves—coordinating vendors and signing off against agreed criteria.

What exactly do we receive at handover?

Machine-specific SOPs, handbooks, installation manuals, and project definition packs (multi-format), signed SAT/IQ/OQ/PQ records, golden-lot reports, and a final acceptance dossier (or punch-list with a closure plan). We also provide on-site training for engineers and operators.

Can you work with our EPC and tool vendors?

Yes. We are independent and vendor-neutral. We coordinate all parties while performing the hands-on work on site.

How long does ramp-up take?

It depends on scope and technology. We agree weekly targets for yield/OEE/throughput and manage to those until handover performance is met.

Do you connect tools to our MES?

Yes. Where required, we configure and verify equipment ↔ MES connectivity (e.g., SECS/GEM/OPC UA), genealogy/WIP tracking, and dashboards.

How long does ramp-up take?

It depends on scope and technology. We agree weekly targets for yield/OEE/throughput and manage to those until handover performance is met.

What do you need from us to start?

A confirmed layout, utility availability, vendor contact points, site EHS rules, and the acceptance criteria (SAT/IQ/OQ/PQ) you want applied.

Why RCT Solutions Installation, Commissioning & Ramp-Up?

We install, commission, and ramp up machines strictly to the owner’s approved layout, site EHS rules, vendor specifications, and acceptance criteria—with full transparency and traceable records. No hidden maintenance agendas, no supplier-driven upselling; our mandate is to meet your performance, documentation, and compliance requirements.

Vendor-neutral

Independency

Vendor-neutral

Independency

Independent of tool vendors and EPCs—decisions serve your factory economics.

Learn more

PV specific depth

Knowledge

PV specific depth

Knowledge

Experience from polysilicon to module ensures interfaces work across every step.

Learn more

On-site availability

Execution

On-site availability

Execution

Engineers embed with your team to de-risk schedules and accelerate ramp-up.

Learn more

Approval-ready

Decision-ready

Finance-ready

Bankable

Deliverables align with stakeholder expectations so projects move from concept to engineering quickly.

Learn more